Skip to content
Call now — 438-300-5850

Code compliance

Metal stair code compliance in Montréal

You received a non-compliance notice, a request from your insurer or an inspection report. We correct what is required, without rebuilding the staircase when it is not necessary.

Commercial steel staircase with a code-compliant guardrail

Where the request comes from

  • A notice from the borough after a complaint or an inspection.
  • A condition from your insurer at policy renewal.
  • A pre-purchase inspection report holding up a sale.
  • A requirement from the condo board or a tenant.
  • A near miss, and the wish not to wait for the next one.

In every case, the deadline matters. We come and look quickly, and give you a written list of what has to be corrected, point by point.

What we check and what we correct

CheckpointUsual correction
Guardrail height (900 or 1,070 mm depending on drop and use)Extension welded on the existing posts, or a new guardrail.
Openings between balusters (100 mm sphere)Balusters added between the existing ones, same profile.
Handrail missing, discontinuous or not graspableContinuous handrail added, between 865 and 1,070 mm, extended at the ends.
Uneven treads, broken nosings, slippery surfacesTreads replaced or levelled, non-slip nosings, checker plate or grating.
Weakened anchors and stringersAnchors redone, reinforcements welded, sections replaced.
Climbable elements on the guardrailHorizontal rails replaced with vertical balusters.

The values above are the general requirements of the Quebec Construction Code. The notice you received cites the articles that apply to you; we work from that notice.

How it goes

  1. 01

    Send the notice and a photo

    The non-compliance notice or the report, and a photo of the stairs. We read both before calling you back.

  2. 02

    Visit and written list

    We measure every point cited. You receive the list of corrections, the price and the lead time, before the work.

  3. 03

    Corrections on site

    Most compliance work is done in one or two visits with the mobile unit, without dismantling the stairs.

  4. 04

    Photos and letter

    Before and after photos, and a letter describing the work done, for the inspector, the insurer or the buyer.

Before / after

Code compliance — Before
Before
Code compliance — After
After

Frequently asked questions

How long does compliance work take?

For a residential staircase, one or two visits are enough in most cases. We confirm the lead time after the visit, together with the price.

Is a permit required?

A repair or added balusters generally do not need one. A new staircase or a structural change often does. We tell you which applies, and your borough confirms.

What if the staircase is too far gone to correct?

We tell you at the visit, with both prices: correct or replace. A replacement is drawn, built in the shop and installed in one day in most cases.

Do you provide a document for the inspector or the insurer?

Yes. A letter describing the work done, with the before and after photos. It goes with your reply to the notice.

Contact

Send the notice and a photo of the stairs

We call you back with a first reading of the corrections needed.

4.9 / 5 · 60+ Google reviewsRead the reviews

Leave blank if the request is for you personally.

One or two sentences. We call you back fast.

📷 A photo or drawing helps us a lot. If you don’t have one, just snap a picture with your phone.

Up to 5 files: photos, PDF, DWG, DXF, STEP or ZIP. 10 MB max per file.